MUHAMMAD FIRDAUS (2006) PENGGUNAAN ANALISIS CPM SEBAGAI MODEL PENINGKATAN EFISIENSI PROYEK (STUDI KASUS PADA BATIK MIRANDA YOGYAKARTA). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (370kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (236kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (319kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (90kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (906kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (109kB)

Abstract

ANALISIS PROYEK

Dosen Pembimbing: Dr. E. Ika Nurul Qamari, S.E., M.Si. | NIDN517096901
Item Type: Thesis (S1)
Uncontrolled Keywords: WAKTU BIAYA NORMAL, CPM, WAKTU BIAYA CEPAT, CRASHING, BIAYA MINIMAL
Divisions: Fakultas Ekonomi dan Bisnis > S1 Manajemen
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 16 Jun 2022 04:04
Last Modified: 16 Jun 2022 04:04
URI: https://etd.umy.ac.id/id/eprint/16283

Actions (login required)

View Item View Item