Dewi Bekti Pertiwi (2020) NALISIS JATUH TEGANGAN DAN RUGI – RUGI DAYA PADA PENYULANG GDN 05 JARINGAN DISTRIBUSI PRIMER 20KV GARDU INDUK GODEAN. S2 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (840kB) |
![]() |
Text (Lembar Pengesahan)
Lembar Pengesahan.pdf Restricted to Registered users only Download (303kB) |
![]() |
Text (Abstrak)
Abstrak.pdf Restricted to Registered users only Download (137kB) |
![]() |
Text (Bab I)
Bab I.pdf Download (144kB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (990kB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (153kB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (630kB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (5kB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Restricted to Registered users only Download (237kB) |
![]() |
Text (Lampiran)
Lampiran.pdf Restricted to Registered users only Download (283kB) |
![]() |
Text (Naskah Publikasi)
Naskah Publikasi.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (Full Text)
Full Text.pdf Restricted to Repository staff only Download (1MB) |
Abstract
The power plant is far away from the center of the load, that is can result
considerable losses in the distribution of electricity. The loss caused by a long line,
so distribution of electricity through transmission or distribution will occur drop
voltage along the line that is passed. Many construction such as buildings, houses
and schools also increase the amount of existing load, this load increase can
becomes one of the factors causing the drop voltage and power losses.
This final project was arranged and has aims to analyzing the drop voltage
and power losses on feeder of GDN 05 supplied from Godean Substation 150 kV
with calculation method within formula. Based on the results of calculation and
analysis obtained the result is drop voltage on the longest network in the feeder
GDN 05 amount of 2.14% and amount of power losses is 1.09%. The value drop
voltage and power losses is affected by the length and area of the cross section and
the load that is installed on the distribution transformer.
Dosen Pembimbing: | Ir. SLAMET SURIPTO,M.Eng.Ir. AGUS JAMAL,M.Eng.,IPM. | NIDN0518116102 |
---|---|
Item Type: | Thesis (S2) |
Divisions: | Fakultas Teknik > S1 Teknik Elektro |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 14 Oct 2021 02:47 |
Last Modified: | 22 Oct 2021 07:17 |
URI: | https://etd.umy.ac.id/id/eprint/1876 |