Muhammad Nurhadi Martono (2020) RENCANA BIAYA KONSTRUKSI BANGUNAN GEDUNG DENGAN METODE COST SIGNIFICANT MODEL (STUDI KASUS : PROYEK LANJUTAN PEMBANGUNAN GEDUNG UGM SCIENCE TECHNO PARK). S1 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (1MB) |
![]() |
Text (Lembar Pengesahan)
Lembar Pengesahan.pdf Restricted to Registered users only Download (380kB) |
![]() |
Text (Abstrak)
Abstrak.pdf Restricted to Registered users only Download (248kB) |
![]() |
Text (Bab I)
Bab I.pdf Download (145kB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (754kB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (609kB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (141kB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Restricted to Registered users only Download (248kB) |
![]() |
Text (Lampiran)
Lampiran.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (Naskah Publikasi)
Naskah Publikasi.pdf Restricted to Registered users only Download (631kB) |
![]() |
Text (Full Text)
Full Text.pdf Restricted to Repository staff only Download (3MB) |
Dosen Pembimbing: | BAGUS SOEBANDONO, S.T., M.ENG. | UNSPECIFIED |
---|---|
Item Type: | Thesis (S1) |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 11 Oct 2021 07:56 |
Last Modified: | 11 Oct 2021 07:56 |
URI: | https://etd.umy.ac.id/id/eprint/2506 |
Actions (login required)
![]() |
View Item |