Muhammad Fatoni Uhrowi (2021) PENERAPAN PENJADWALAN MENGGUNAKAN BUILDING INFORMATION MODELLING PADA GEDUNG IGD RSUD PATUH PATUT PATJU. S1 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (7MB) |
![]() |
Text (Lembar Pengesahan)
Lembar Pengesahan.pdf Restricted to Registered users only Download (429kB) |
![]() |
Text (Abstrak)
Abstrak.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Bab I)
Bab I.pdf Download (7MB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Lampiran)
Lampiran.pdf Restricted to Registered users only Download (7MB) |
![]() |
Text (Naskah Publikasi)
Naskah Publikasi.pdf Restricted to Registered users only Download (217kB) |
![]() |
Text (Full Text)
Full Text.pdf Restricted to Repository staff only Download (7MB) |
Abstract
The development of information technology in construction sector is very helpful to develope infrastructure in a place. One of the newest system for planning, implementation, and maintenance of infrastructures is Building Information Modelling or commonly referred as BIM. The application of BIM in this study is to determine the effectiveness by using BIM and its comparison with previous technology that using Microsoft Project in term of project schedulling by using emergency building of Patuh Patuh Patju Hospital in west lombok as an object. The method used is by modelling objects in 3D using Tekla Structures 2020 and continued to project schedulling or called 4D modelling using same application. The results that obtained from modelling are compared using Microsoft Project 2019. It was found that Microsoft Project 2019 had a faster processing time with a difference of 3 days than using BIM schedulling. Using BIM software such as Tekla Structure 2020 actually more effective if it is collaborated with others software because they can complement each other from the advantages of each application.
Dosen Pembimbing: | Bagus Soebandono, S.T., M.Eng. | NIDN0513058101 |
---|---|
Item Type: | Thesis (S1) |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 14 Dec 2021 03:06 |
Last Modified: | 14 Dec 2021 03:06 |
URI: | https://etd.umy.ac.id/id/eprint/5654 |
Actions (login required)
![]() |
View Item |