ZULKIFLI APRIAN P.S (2019) ANALISIS KONDISI KERUSAKAN JALAN PERKERASAN LENTUR PADA LAPIS PERMUKAAN JALAN GOMBONG - PURING MENGGUNAKAN METODE PAVEMENT CONDITIONAL INDEX (PCI). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of COVER] Text (COVER)
COVER

Download (44kB)
[thumbnail of HALAMAN JUDUL] Text (HALAMAN JUDUL)
HALAMAN JUDUL

Download (554kB)
[thumbnail of HALAMAN PENGESAHAN] Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN
Restricted to Registered users only

Download (307kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (200kB)
[thumbnail of BAB I] Text (BAB I)
BAB I

Download (114kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (3MB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (379kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV
Restricted to Registered users only

Download (809kB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (107kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (219kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN
Restricted to Registered users only

Download (3MB)
[thumbnail of NASKAH PUBLIKASI] Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI
Restricted to Registered users only

Download (854kB)
Official URL: http://repository.umy.ac.id/handle/123456789/28922

Abstract

Road is a connecting line between one place to another place. As time passes, the road will experience a decrease in the quality of road marked by damage to the road layer. Damage to the road can cause discomfort and insecurity in driving. The road of Gombong – Puring is visually damaged so the purpose of this study is to analyze the pavement complexity on the road surface on the Gombong – Puring road, Kebumen Regency, Central Java Province uses the Pavement Conditional Index (PCI) method. Based on the results of data analysis and discussions that have been conducted, it can be concluded that the condition of the damage to the pavement of the Gombong – Puring road section has s total index value of 60,27 % which is included in the good category. There are 6 types of damage to the Gombong - Puring road section, with the type of damage that crack of the crocodile with total damage rate of 99 pieces with 35,61 % damage, cracked edges with a total damage rate of 1 piece with 0,36 % damage, cracks connecting with total levels damage to 1 piece with 0,36 % damage, longitudinal cracks with a total damage rate of 13 pieces with 4,68 % damage, patches with a total damage rate of 44 pieces with 15,83 % damage, holes with a total damage rate of 120 pieces with 43,17% damage.

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: PAVEMENT CONDITIONAL INDEKS, ROAD DAMAGE ANALYSIS, ROAD PAVEMENT.
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email Admin Perpustakaan 2
Last Modified: 09 Oct 2025 02:04
URI: https://etd.umy.ac.id/id/eprint/57629

Actions (login required)

View Item View Item