MUHAMMAD ABDUH DAHLAN (2019) STUDI ANALISIS KOORDINASI PROTEKSI RELE DIFFERENTIAL DAN RELE OVERCURRENT PADA TRANSFORMATOR UNTUK MENGHINDARI KEGAGALAN PROTEKSI DENGAN MENGGUNAKAN SOFTWARE ETAP 12.6. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of COVER] Text (COVER)
COVER

Download (77kB)
[thumbnail of HALAMAN JUDUL] Text (HALAMAN JUDUL)
HALAMAN JUDUL

Download (313kB)
[thumbnail of HALAMAN PENGESAHAN] Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN
Restricted to Registered users only

Download (192kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (8kB)
[thumbnail of BAB I] Text (BAB I)
BAB I

Download (119kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (829kB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (32kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV
Restricted to Registered users only

Download (888kB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (11kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (119kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN
Restricted to Registered users only

Download (411kB)
[thumbnail of NASKAH PUBLIKASI] Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI
Restricted to Registered users only

Download (359kB)
Official URL: http://repository.umy.ac.id/handle/123456789/28839

Abstract

An electric power system has a substation which is an important part of receiving electrical energy from the plant and then distributing it to consumers, where the substation has electrical equipment to support the process of sending electrical energy which if not properly protected when a disturbance occurs can damage the equipment and have the price is quite expensive, so that a good electrical protection system is needed, which is selective, sensitive, fast, reliable, and economical to maximize shipping that is able to feel, provide the reliability of electric power distribution systems and minimize interference and damage especially in main transformers. In this final project research discusses the analysis of differential relay coordination coordination as the main safety and overcurrent relay as a backup and overcurrent protection on the transformer to avoid protection failure by comparing the results of manual setting calculation data and installed settings in the field then performing simulation using ETAP software 12.6 to find out the simulation of the relay relay. Overcurrent relay is used as overcurrent protection relay which will describe the circuit breaker when the current exceeds the limit value setting against two secondary CT currents that are used against interference in the protection zone.

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: COORDINATION OF PROTECTION, OVER CURRENT RELAY, DIFFERENTIAL RELAY ETAP 12.6
Divisions: Fakultas Teknik > S1 Teknik Elektro
Depositing User: Unnamed user with email Admin Perpustakaan 2
Last Modified: 09 Oct 2025 02:14
URI: https://etd.umy.ac.id/id/eprint/57713

Actions (login required)

View Item View Item