NURHIDAYAH PANARA (2020) EVALUASI RISIKO-RISIKO KETERLAMABATAN PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG KAMPUS C UNIVERSITAS ‘AISYIYAH YOGYAKARTA. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of COVER] Text (COVER)
COVER

Download (90kB)
[thumbnail of HALAMAN JUDUL] Text (HALAMAN JUDUL)
HALAMAN JUDUL

Download (399kB)
[thumbnail of HALAMAN PENGESAHAN] Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN
Restricted to Registered users only

Download (1MB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (70kB)
[thumbnail of BAB I] Text (BAB I)
BAB I

Download (85kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (243kB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (243kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV
Restricted to Registered users only

Download (1MB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (253kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (79kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN
Restricted to Registered users only

Download (475kB)
[thumbnail of NASKAH PUBLIKASI] Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI
Restricted to Registered users only

Download (675kB)
Official URL: http://repository.umy.ac.id/handle/123456789/35606

Abstract

The multi-storey building construction project is very specific both in terms of quality and time costs that have different characteristics and risks, so arrangements are needed to get maximum and efficient results. Time is one of the benchmarks for project success and cost achievement benchmarks, so it is necessary to identify the risk of vulnerability in the time of a multi-storey building project work, so that concepts or methods are needed to identify the risk of delays in order to obtain certainty that is by way of a matrix risk formula. from the results of identification in the construction project of Campus C University Building Aisyiyah Yogyakarta, factors that resulted in the sustainability of the project start from the limitations of materials, the quality of labor and limited labor, of the three categories that occur at many stages of the 5th floor structure work, where after identifying and doing calculations with the risk matrix formula = ivent x empac get the number 7.21 which is included in the category of low risk. Identification of the risk of extinction becomes very important in achieving the success of a project, or become a reference and pilot to be used as a reference on other similar projects.

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: MANAGEMENT; RISK MATRIX; HIGH RISE BUILDING PROJECT; RISK; TIME
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email Admin Perpustakaan 1
Last Modified: 09 Oct 2025 02:15
URI: https://etd.umy.ac.id/id/eprint/57725

Actions (login required)

View Item View Item