NIEKEN RARASATI (2019) EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN GEDUNG RUMAH SUSUN SEWA TINGKAT TINGGI PASAR RUMPUT JAKARTA SELATAN. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of COVER] Text (COVER)
COVER

Download (206kB)
[thumbnail of HALAMAN JUDUL] Text (HALAMAN JUDUL)
HALAMAN JUDUL

Download (1MB)
[thumbnail of HALAMAN PENGESAHAN] Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN
Restricted to Registered users only

Download (57kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (565kB)
[thumbnail of BAB I] Text (BAB I)
BAB I

Download (401kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (490kB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (556kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV
Restricted to Registered users only

Download (742kB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (322kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (293kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN
Restricted to Registered users only

Download (584kB)
[thumbnail of NASKAH PUBLIKASI] Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI
Restricted to Registered users only

Download (1MB)
Official URL: http://repository.umy.ac.id/handle/123456789/28770

Abstract

The good management of a construction project will be able to minimize the potential for workplace accidents, because the larger project will certainly cause big and complex problems. In this study aims to asess of Occupational Safety and Health Management System in the Pasar Rumput Flats Building Project at the South Jakarta. The results of the analysis begin with direct observation data through interviews at the location to obtain the real answer of the implementation Occupational Safety and Health Management System. From this study obtained a value of 83.87%, this figure is categorized as MEDIUM in the implementation of SMK3 because its value is between 60% -85% and the completeness value of K3 facilities is 81,8% it is MEDIUM categorized in completing K3 facilities because its value is between> 85%

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: MANAGEMENT SYSTEM, K3, CONSTRUCTION PROJECT, BUILDING, FLATS
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email Admin Perpustakaan 2
Last Modified: 09 Oct 2025 02:25
URI: https://etd.umy.ac.id/id/eprint/57799

Actions (login required)

View Item View Item