ARIF WIBOWO (2010) EVALUASI LOAD FACTOR ANGKUTAN UMUM BUS TRANS JOGJA JALUR 2A SETELAH PENAMBAHAN HALTE. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of BAB I] Text (BAB I)
BAB I

Download (867kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (3MB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (1MB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (9MB)
[thumbnail of BAB VI] Text (BAB VI)
BAB VI
Restricted to Registered users only

Download (222kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (281kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (292kB)
[thumbnail of JUDUL] Text (JUDUL)
JUDUL
Restricted to Registered users only

Download (2MB)
Official URL: http://repository.umy.ac.id/handle/123456789/6230

Abstract

Berdasarkan hasil penelitian Tahun 2008 dan 2009 load factor terdahulu belum memenuhi standart World Bank atau PP. No. 43 tahun 1993, yaitu sebesar minimal 70%. Hasil observasi langsung yang telah dilakukan rute trayek 2A pada tanggal 1 Mei 2010, diketahui bahwa halte UNY/Gejayan I dan Halte Gejayan II telah beroperasi. Berdasarjkan hasil observasi tersebut yang membuat peneliti menganalisis nilai Load Factor setelah adanya penambahan kedua halte baru tersebut apakah akan menaikkan nilai load factor dijalur 2A.

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: LOAD FACTOR; WAKTU TEMPUH; HEADWAY
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email Admin Perpustakaan5
Last Modified: 09 Oct 2025 02:51
URI: https://etd.umy.ac.id/id/eprint/57953

Actions (login required)

View Item View Item