FEBRI ANA DWI RAHAYU (2020) PERCEPATAN JADWAL MENGGUNAKAN SISTEM LEMBUR DENGAN PRECEDENCE DIAGRAMMING METHOD (STUDI KASUS : PROYEK PEMBANGUNAN BENDUNGAN PIDEKSO YANG TERLETAK DI KABUPATEN WONOGIRI PROVINSI JAWA TENGAH). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of COVER] Text (COVER)
COVER

Download (284kB)
[thumbnail of HALAMAN PENGESAHAN] Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN
Restricted to Registered users only

Download (588kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (492kB)
[thumbnail of BAB I] Text (BAB I)
BAB I

Download (420kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (605kB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (499kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV
Restricted to Registered users only

Download (1MB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (322kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (276kB)
[thumbnail of NASKAH PUBLIKASI] Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI
Restricted to Registered users only

Download (1MB)
Official URL: http://repository.umy.ac.id/handle/123456789/35551

Abstract

In a construction project, time, cost, and quality are important things that must be considered so that delays in the project have a small percentage. The purpose of this study is to obtain the results of the analysis of the acceleration of the duration that affects the acceleration of project costs with an overtime system of 1 hour, 2 hours and 3 hours. The addition of labor is also done to be a comparison and obtain effective and optimal results. This study uses the Duration Cost Trade Off method with Microsoft Excel for data processing. The scheduling technique uses the PDM method under normal conditions obtained 5280 days duration with a total project cost of Rp 64,858,974,293.53. On the addition of 1 hour overtime hours, the duration time of 4746.1 days requires Rp 65,380,605,758.77. Adding 2 hours overtime with a duration of 4355.6 days requires a fee of Rp 66,264,119,493.23. The addition of 3-hour overtime hours with a duration of 4100.8 days requires a fee of Rp 67,107,394,957.29. The addition of 1 hour labor with a duration of 4746.1 days requires a fee of Rp 64,859,159,427.53. The addition of 2 hours overtime with a duration of 4355.6 days requires a fee of Rp 64,859,294,490.03. The addition of 3-hour overtime hours with a duration of 4100.8 days requires a fee of Rp 64,859,412,983.78. After analyzing the data, an effective and optimal value is obtained, namely the addition of 3 hours overtime with a duration of 4100.8 days requiring a fee of Rp 64,859,412,983.78.

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: TIME; COST; OVERTIME SYSTEM; MICROSOFT EXCEL; PRECEDENCE DIAGRAMMING METHOD
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email Admin Perpustakaan 1
Last Modified: 09 Oct 2025 02:52
URI: https://etd.umy.ac.id/id/eprint/57961

Actions (login required)

View Item View Item