RINI SETIANINGSIH (2019) EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JEMBATAN PABELAN DI RUAS JALAN TLATAR TALUN. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of COVER] Text (COVER)
COVER

Download (56kB)
[thumbnail of HALAMAN JUDUL] Text (HALAMAN JUDUL)
HALAMAN JUDUL

Download (1MB)
[thumbnail of HALAMAN PENGESAHAN] Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN
Restricted to Registered users only

Download (621kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK

Download (10kB)
[thumbnail of BAB I] Text (BAB I)
BAB I

Download (98kB)
[thumbnail of BAB II] Text (BAB II)
BAB II
Restricted to Registered users only

Download (417kB)
[thumbnail of BAB III] Text (BAB III)
BAB III
Restricted to Registered users only

Download (115kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV
Restricted to Registered users only

Download (999kB)
[thumbnail of BAB V] Text (BAB V)
BAB V
Restricted to Registered users only

Download (11kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA
Restricted to Registered users only

Download (14kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN
Restricted to Registered users only

Download (402kB)
[thumbnail of NASKAH PUBLIKASI] Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI
Restricted to Registered users only

Download (669kB)
Official URL: http://repository.umy.ac.id/handle/123456789/30143

Abstract

The success of the net of a project is influenced by factors such as duration of completion of the project briefly and at a minimal cost but do not eliminate the quality elemen of the work that will be generated from the end o the job. The most common way to generate effective and efficient is to compare construction cost in the addition of heavy equipment, which needs to be noticed for expedited work is critical work. The result of this research shows that if after the addition of overtime working hours for 1 hours the cost must be Rp. 4.529.642.950,10 with the duration of 192,46 days, for additional hours overtime for 2 hours cost incurred Rp. 4.480.214.771,29 with duration of 178,50 days. For the addition of overtime for 3 hours, cost to be incurred Rp. 4.440.003.210,43 with a final duration of 167,13 days, while for the addition of heavy equipment whose duration is equivalent to 1 hour cost incurred Rp. 4.525.437.367,00 with a duration of 192,46 days, for the addition of equipments 2 hour with the cost of Rp. 4.470.569.682,67 with 178,50 days duration, then for the addition of equipment equivalent to 3 hours obtained at a cost of Rp. 4.425.902.377,53 with a duration of 167,13 days. The cost of adding heavy equipment here is more efficient than time and cost.

Dosen Pembimbing: UNSPECIFIED | UNSPECIFIED
Item Type: Thesis (S1)
Uncontrolled Keywords: TIME COST TRADE OFF , MICROSOFT PROJECT 2010, ADDITIONAL HOURS OVERTIME, ADDITION OF HEAVY EQUIPMENT.
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email Admin Perpustakaan 1
Last Modified: 09 Oct 2025 04:00
URI: https://etd.umy.ac.id/id/eprint/58495

Actions (login required)

View Item View Item