RINI SETIANINGSIH (2019) EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JEMBATAN PABELAN DI RUAS JALAN TLATAR TALUN. S1 thesis, Universitas Muhammadiyah Yogyakarta.
|
Text (COVER)
COVER Download (56kB) |
|
|
Text (HALAMAN JUDUL)
HALAMAN JUDUL Download (1MB) |
|
|
Text (HALAMAN PENGESAHAN)
HALAMAN PENGESAHAN Restricted to Registered users only Download (621kB) |
|
|
Text (ABSTRAK)
ABSTRAK Download (10kB) |
|
|
Text (BAB I)
BAB I Download (98kB) |
|
|
Text (BAB II)
BAB II Restricted to Registered users only Download (417kB) |
|
|
Text (BAB III)
BAB III Restricted to Registered users only Download (115kB) |
|
|
Text (BAB IV)
BAB IV Restricted to Registered users only Download (999kB) |
|
|
Text (BAB V)
BAB V Restricted to Registered users only Download (11kB) |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA Restricted to Registered users only Download (14kB) |
|
|
Text (LAMPIRAN)
LAMPIRAN Restricted to Registered users only Download (402kB) |
|
|
Text (NASKAH PUBLIKASI)
NASKAH PUBLIKASI Restricted to Registered users only Download (669kB) |
Abstract
The success of the net of a project is influenced by factors such as duration of completion of the project briefly and at a minimal cost but do not eliminate the quality elemen of the work that will be generated from the end o the job. The most common way to generate effective and efficient is to compare construction cost in the addition of heavy equipment, which needs to be noticed for expedited work is critical work. The result of this research shows that if after the addition of overtime working hours for 1 hours the cost must be Rp. 4.529.642.950,10 with the duration of 192,46 days, for additional hours overtime for 2 hours cost incurred Rp. 4.480.214.771,29 with duration of 178,50 days. For the addition of overtime for 3 hours, cost to be incurred Rp. 4.440.003.210,43 with a final duration of 167,13 days, while for the addition of heavy equipment whose duration is equivalent to 1 hour cost incurred Rp. 4.525.437.367,00 with a duration of 192,46 days, for the addition of equipments 2 hour with the cost of Rp. 4.470.569.682,67 with 178,50 days duration, then for the addition of equipment equivalent to 3 hours obtained at a cost of Rp. 4.425.902.377,53 with a duration of 167,13 days. The cost of adding heavy equipment here is more efficient than time and cost.
| Dosen Pembimbing: | UNSPECIFIED | UNSPECIFIED |
|---|---|
| Item Type: | Thesis (S1) |
| Uncontrolled Keywords: | TIME COST TRADE OFF , MICROSOFT PROJECT 2010, ADDITIONAL HOURS OVERTIME, ADDITION OF HEAVY EQUIPMENT. |
| Divisions: | Fakultas Teknik > S1 Teknik Sipil |
| Depositing User: | Unnamed user with email Admin Perpustakaan 1 |
| Last Modified: | 09 Oct 2025 04:00 |
| URI: | https://etd.umy.ac.id/id/eprint/58495 |
Actions (login required)
![]() |
View Item |