ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (STUDI KASUS PENGEMBANGAN RUMAH SUSUSN SEDERHANA (RUSUNAWA) PRINGWULUNG KAB. SLEMAN DIY).

TOSARI WIJAYA (2014) ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (STUDI KASUS PENGEMBANGAN RUMAH SUSUSN SEDERHANA (RUSUNAWA) PRINGWULUNG KAB. SLEMAN DIY). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (26kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (22kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (41kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (141kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (26kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (420kB)
Item Type: Thesis (S1)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 22 Jul 2022 07:53
Last Modified: 22 Jul 2022 07:53
URI: https://etd.umy.ac.id/id/eprint/8594

Actions (login required)

View Item
View Item