TOSARI WIJAYA (2014) ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (STUDI KASUS PENGEMBANGAN RUMAH SUSUSN SEDERHANA (RUSUNAWA) PRINGWULUNG KAB. SLEMAN DIY). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (26kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (22kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (41kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (141kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (26kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (420kB)
Dosen Pembimbing: IR. H. MANDIYO PRIYO, MT JAZA’UL IKHSAN, ST, MT, PH.D M.HERI ZUL | UNSPECIFIED
Item Type: Thesis (S1)
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 22 Jul 2022 07:53
Last Modified: 22 Jul 2022 07:53
URI: https://etd.umy.ac.id/id/eprint/8594

Actions (login required)

View Item View Item