[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 1.

Thesis

ADI SUMANTO (2015) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA ( LEMBUR ) MENGGUNAKAN METODE TIME COST TRADE OFF. S1 thesis, Universitas Muhammadiyah Yogyakarta.

This list was generated on Mon May 19 11:30:19 2025 WIB.