[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Amelia Widowati (2017) STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TIME COST TRADE OFF PADA PROYEK PEMBANGUNAN GEDUNG (STUDI KASUS : PEKERJAAN PEMBANGUNAN HOTEL UNISI YOGYAKARTA). S1 thesis, Universitas Muhammadiyah Yogyakarta.

This list was generated on Thu Jun 12 15:18:49 2025 WIB.