Items where Author is "SURYO WIBOWO"
Group by: Item Type | No Grouping
Number of items: 1.
SURYO WIBOWO (2017) STUDI OPTIMASI WAKTU DAN BIAYA DENGAN METODE TCTO (TIME COST TRADE OFF) PADA PROYEK KONSTRUKSI (STUDI KASUS : PEMBANGUNAN JALAN TOL SEMARANG-SOLO PART II : BAWEN-SOLO, SECTION 3 : BAWEN-SALATIGA, PAKET 3,2 POLOSIRI-SIDOREJO (STA.26+300-STA.33+100)). S1 thesis, UNSPECIFIED.