Items where Author is "WILDAN HABINATA SHABRI"

Group by: Item Type | No Grouping
Number of items: 1.

WILDAN HABINATA SHABRI (2015) ANALISIS PERCEPATAN WAKTU DAN BIAYA PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) MENGGUNAKAN METODE TIME COST TRADE OFF (STUDI KASUS : PROYEK PEMBANGUNAN BENDUNG PROGO PISTAN). S1 thesis, Universitas Muhammadiyah Yogyakarta.

This list was generated on Sun Dec 22 15:50:44 2024 WIB.