Ahmad Rofiq Robbani (2020) Potensi Risiko Kecelakan Kerja Pada Pembangunan Gedung Perkuliahan Bertingkat Sedang Di Yogyakarta. S1 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (378kB) |
![]() |
Text (Lembar Pengesahan)
Lembar Pengesahan.pdf Restricted to Registered users only Download (163kB) |
![]() |
Text (Abstrak)
Abstrak.pdf Restricted to Registered users only Download (118kB) |
![]() |
Text (Bab I)
Bab I.pdf Download (109kB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (132kB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (262kB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (504kB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (61kB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Restricted to Registered users only Download (13kB) |
![]() |
Text (Lampiran)
Lampiran.pdf Restricted to Registered users only Download (227kB) |
![]() |
Text (Naskah Publikasi)
Naskah Publikasi.pdf Restricted to Registered users only Download (475kB) |
![]() |
Text (Full Text)
Full Text.pdf Restricted to Repository staff only Download (1MB) |
Abstract
Today, the rate of work accidents in Indonesia is still very large. Most of
the factors that cause work accidents in Indonesia are workers' lack of awareness
in using PPE (Personal Protective Equipment). By wearing PPE it is clear that it
can greatly reduce the potential for work accidents in an ongoing project. This
research examines the potential risk of work accidents that occur in a 5-storey
building project in Yogyakarta. The case study is at the PGRI Yogyakarta
University. The data in this study were obtained from a questionnaire made by the
compilers and filled in by 5 people who were included in the organization of the
lecture building construction project at the PGRI University Yogyakarta. The PGRI
Yogyakarta University lecture building construction project has 17 activities from
6 stages of work with 40 events. From all activities, work stages, and events, this
project has an average hazard risk scale of 1.69 which is included in the “Low
Risk” category with the largest risk scale of 2.16 in basement work. While the
smallest risk scale is found in the work on the 2nd floor to the 5th floor with a value
of 1.95
Dosen Pembimbing: | Dr. M. Heri Zulfiar, S.T., M.T. | NIDN515026701 |
---|---|
Item Type: | Thesis (S1) |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 12 Oct 2021 02:31 |
Last Modified: | 04 Nov 2021 06:53 |
URI: | https://etd.umy.ac.id/id/eprint/2277 |
Actions (login required)
![]() |
View Item |