STUDI ANALISIS RUGI-RUGI DAYA PADA TRANSMISI 150 KV PLN B’RIGHT BATAM DENGAN MENGGUNAKAN SOFTWARE ETAP (ELECTRIC TRANSIENT AND ANALYSIS PROGRAM)

MUKTI SYARIF RAZEN (2016) STUDI ANALISIS RUGI-RUGI DAYA PADA TRANSMISI 150 KV PLN B’RIGHT BATAM DENGAN MENGGUNAKAN SOFTWARE ETAP (ELECTRIC TRANSIENT AND ANALYSIS PROGRAM). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Cover] Text (Cover)
Cover.pdf

Download (143kB)
[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (482kB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf

Download (352kB)
[thumbnail of Abstract] Text (Abstract)
Abstract.pdf

Download (5kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (181kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (531kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (378kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (161kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf

Download (162kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Repository staff only

Download (303kB)

Abstract

The needs of the electrical energy that increase continuously every year in Indonesia and many of the development of industrial development in order to improve the economy of Indonesia. Therefore the government should be better in the electricity distribution system to consumers both the public and the industry in SUTT 150kV.
In the distribution of electricity transmission network is in the pipe from the power plants to customers have lost power caused some disorders that occur on the transmission channels. With more length conductor make power compensation be greater. So the purpose of this research is to calculate the power is lost in the transmission channel SUTT 150kV. The counting done the highest power compensation and compensation transmission power. The highest voltage fall is Saguling Baloi path to Saguling great stone of 0.175 % and add with existing transmission on the moon february 2016 of 303,380.33 KWh so that if in rupiah Rp 390,450,484.71. So from the final conclusion that Add with existing happens in Batam continued to fall to 1 % in vulnerable time 1 years.
Key Words: power compensation

Item Type: Thesis (S1)
Uncontrolled Keywords: POWER COMPENSATION
Divisions: Fakultas Teknik > Teknik Elektro S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 17 Jul 2023 08:28
Last Modified: 17 Jul 2023 08:28
URI: https://etd.umy.ac.id/id/eprint/27302

Actions (login required)

View Item
View Item