PERCEPATAN DURASI DENGAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN LABORATORIUM SEKOLAH

FATLIA APRILIYANI (2022) PERCEPATAN DURASI DENGAN METODE DURATION COST TRADE OFF PADA PROYEK PEMBANGUNAN LABORATORIUM SEKOLAH. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (582kB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf
Restricted to Registered users only

Download (241kB)
[thumbnail of Abstrak] Text (Abstrak)
Abstrak.pdf
Restricted to Registered users only

Download (10kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (18kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (436kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (303kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (525kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (14kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (20kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only

Download (11MB)
[thumbnail of Naskah Publikasi] Text (Naskah Publikasi)
Naskah Publikasi.pdf
Restricted to Registered users only

Download (673kB)
[thumbnail of Full Text] Text (Full Text)
Full Text.pdf
Restricted to Repository staff only

Download (13MB)

Abstract

PEMBANGUNAN INDUSTRI KONSTRUKSI SEMAKIN PESAT DENGAN MENINGKATNYA PEMBANGUNAN PROYEK INFRASTRUKTUR DI DAERAH-DAERAH INDONESIA. UNTUK MEMBANGUN PROYEK INFRASTRUKTUR TERSEBUT, DIBUTUHKAN PENGELOLAAN MANAJEMEN KONSTRUKSI YANG TERORGANISIR, SEPERTI PENGELOLAAN SUMBER DAYA PERUSAHAAN, BIAYA YANG EFISIEN, SERTA WAKTU YANG EFEKTIF. NAMUN, TIDAK SEMUA PROYEK DAPAT BERJALAN DENGAN LANCAR KARENA DISEBABKAN OLEH BEBERAPA FAKTOR YANG MENGAKIBATKAN TERJADINYA KETERLAMBATAN PENYELESAIAN PROYEK. KETERLAMBATAN PROYEK KONSTRUKSI ADALAH PENYELESAIAN PEMBANGUNAN PROYEK YANG TIDAK SESUAI PADA WAKTU YANG TELAH DIRENCANAKAN DAN DAPAT MENIMBULKAN KERUGIAN, SEPERTI PERUSAHAAN PROYEK TERKAIT DIHARUSKAN MEMBAYAR DENDA YANG SUDAH DIPERHITUNGKAN. OLEH KARENA ITU, UNTUK MENGATASI HAL TERSEBUT PENELITIAN INI MEMILIKI TUJUAN, YAITU MELAKUKAN PEMODELAN PERCEPATAN DURASI DAN BIAYA MENGGUNAKAN METODE DURATION COST TRADE OFF (DCTO) DAN PENDEKATAN PROJECT CRASHING DENGAN ALTERNATIF PENAMBAHAN JAM KERJA LEMBUR 1 JAM, 2 JAM, DAN 3 JAM. SETELAH DILAKUKAN PEMODELAN, PENELITIAN INI MENGHASILKAN DURASI PENYELESAIAN PROYEK YANG LEBIH SINGKAT DARI DURASI NORMAL SELAMA 126 HARI DENGAN BIAYA TOTAL PROYEK SEBESAR RP 3.217.094.960,27. PADA PENAMBAHAN JAM KERJA LEMBUR 1 JAM MENGHASILKAN DURASI PENYELESAIAN SELAMA 118 HARI DENGAN BIAYA TOTAL PROYEK SEBESAR RP 3.200.441.465,69. PADA PENAMBAHAN JAM KERJA LEMBUR 2 JAM MENGHASILKAN DURASI PENYELESAIAN SELAMA 112 HARI DENGAN BIAYA TOTAL PROYEK SEBESAR RP 3.187.811.775,82. PADA PENAMBAHAN JAM KERJA LEMBUR 3 JAM MENGHASILKAN DURASI PENYELESAIAN SELAMA 108 HARI DENGAN BIAYA TOTAL PROYEK SEBESAR RP 3.179.341.552,36.

Item Type: Thesis (S1)
Uncontrolled Keywords: ACCELERATION OF DURATION, ADDITION OF OVERTIME HOURS, DURATION COST TRADE OFF, CONSTRUCTION PROJECTS
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Aidilla Qurotianti
Date Deposited: 09 Sep 2022 03:25
Last Modified: 09 Sep 2022 03:25
URI: https://etd.umy.ac.id/id/eprint/33446

Actions (login required)

View Item
View Item