EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JEMBATAN SILENG

Wildan Jagadati Niko Lazuardi (2021) EFISIENSI BIAYA DAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE CRASHING PADA PROYEK PEMBANGUNAN JEMBATAN SILENG. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (639kB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf
Restricted to Registered users only

Download (145kB)
[thumbnail of Abstrak] Text (Abstrak)
Abstrak.pdf
Restricted to Registered users only

Download (11kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (419kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (923kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (411kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (161kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (222kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only

Download (454kB)
[thumbnail of Naskah Publikasi] Text (Naskah Publikasi)
Naskah Publikasi.pdf
Restricted to Registered users only

Download (623kB)
[thumbnail of Full Text] Text (Full Text)
Full Text.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Time and cost are two factors that influence the success of a project.
Project benchmarks can be seen from the short completion time and minimal cost but do not neglect the quality of work that will be produced at the end of the project. The way that can be done to produce an effective and efficient project is by comparing the construction costs of adding working hours and adding heavy equipment, the accelerated selection of critical work is something that needs to be considered.
Management of a project needs to be carried out systematically to ensure that the implementation time of a project is in accordance with the contract or faster, so that the costs incurred can provide benefits. In this case analysis using the Time Cost Trade Off method with the help of the Microsoft Project 2010 program.
The results of this study indicate that the cost after calculating the acceleration with the addition of working hours and the addition of tools found that the acceleration of the addition of tools for 3 hours with crashing duration
195.55 days at a cost of Rp6,482,126,072.26 more efficient and cheaper compared to the addition of working hours and also cheaper than the costs that must be incurred if the project experiences a delay in the completion of the work.
Keywords : Time Cost Trade Off, Microsoft Project 2010, Additional Hours Overtime, Addition of Heavy Equipment.

Item Type: Thesis (S1)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 06 Nov 2021 01:43
Last Modified: 06 Nov 2021 01:43
URI: https://etd.umy.ac.id/id/eprint/5765

Actions (login required)

View Item
View Item