Analisis Koordinasi Proteksi Rele Arus Lebih (Overcurrent Relay) Pada PT. PLN Gardu Induk Rawalo 150kV

Yoga Pratama (2021) Analisis Koordinasi Proteksi Rele Arus Lebih (Overcurrent Relay) Pada PT. PLN Gardu Induk Rawalo 150kV. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (565kB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf
Restricted to Registered users only

Download (224kB)
[thumbnail of Abstrak] Text (Abstrak)
Abstrak.pdf
Restricted to Registered users only

Download (14kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (23kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (234kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (130kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (759kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (14kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (72kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only

Download (534kB)
[thumbnail of Naskah Publikasi] Text (Naskah Publikasi)
Naskah Publikasi.pdf
Restricted to Registered users only

Download (153kB)
[thumbnail of Full Text] Text (Full Text)
Full Text.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

–Rawalo 150kV Substation is a type of transmission substation located in southern Java, which is more precisely located in Purwokerto, Central Java, which is useful for distributing electric power from the generator to the distribution substation. The main purpose of the author in making this research is to find out how to determine the correct Overcurrent relay setting according to the needs of the Rawalo 150kV Substation and also to know whether the condition of the Overcurrent relay in the Rawalo 150kV Substation is in good or bad condition with ETAP 19.6 software. as the main simulator. In determining the short circuit current that occurs, the author first calculates manually obtained from the network equivalent of a distance of 21.9 km, the distance is divided into 0%, 25%, 50%, 75% and 100%. There is also a difference in the setting value in the field with the manual calculation setting value with the ETAP 19.6 software, the Overcurrent relay installed between the feeder and incoming side and the relay which is calculated at the same time has a time difference of 0.1. Therefore, the time difference that occurs is included in a reasonable condition because it is still included in the tolerance for relay settings.

Item Type: Thesis (S1)
Divisions: Fakultas Teknik > Teknik Elektro S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 13 Dec 2021 07:57
Last Modified: 13 Dec 2021 07:57
URI: https://etd.umy.ac.id/id/eprint/5825

Actions (login required)

View Item
View Item