Raihan Adila Hidayat (2021) Kinerja Waktu dan Biaya Pada Proyek Konstruksi Jalan Dengan Earned Value Method (Studi Kasus : Proyek Pembangunan Jalur Jalan Lintas Selatan Paket Lot.1 Tambakreja - Bantarsari). S1 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (1MB) |
![]() |
Text (Lembar Pengesahan)
Lembar Pengesahan.pdf Restricted to Registered users only Download (445kB) |
![]() |
Text (Abstrak)
Abstrak.pdf Restricted to Registered users only Download (432kB) |
![]() |
Text (Bab I)
Bab I.pdf Download (874kB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (3MB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (640kB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (6MB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (403kB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Restricted to Registered users only Download (920kB) |
![]() |
Text (Lampiran)
Lampiran.pdf Restricted to Registered users only Download (891kB) |
![]() |
Text (Naskah Publikasi)
Naskah Publikasi.pdf Restricted to Registered users only Download (453kB) |
![]() |
Text (Full Text)
Full Text.pdf Restricted to Repository staff only Download (15MB) |
Abstract
The construction projects have a high level of complexity. Sometimes there are projects that are delayed or suffer losses. Earned Value Method combines in terms of cost, schedule, and work progress. This concept analyzes the work that has been completed at a time and assesses it based on the total budget that has been provided for each of these jobs. This method can calculate whether the progress of project work implementation is proportional to the use of the budgeted portion. This method will be implemented in the construction project of the Southern Cross Road Package Lot.1 Tambakreja – Bantarsari. In the project performance section, it is analyzed based on the cost performance index and schedule performance index. As for the calculation, it is based on BCWS, BCWP, and ACWP. The results of the CPI calculation for the 50th week until 54th week shows = 1 value, which means that it shows normal cost performance in this period and for an SPI it value< 1, it means that the project shows poor performance and is behind the planned target. Meanwhile, the estimated total cost to complete this project is Rp. 130.121.712.702 which means the project has suffered losses, and the project completion time has increased from 615 days to 1069 days, which means the project will be delayed.
Dosen Pembimbing: | Muhammad Heri Zulfiar, Dr., S.T., M.T. | NIDN0515026701 |
---|---|
Item Type: | Thesis (S1) |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 13 Dec 2021 07:23 |
Last Modified: | 13 Dec 2021 07:23 |
URI: | https://etd.umy.ac.id/id/eprint/6075 |
Actions (login required)
![]() |
View Item |