Kinerja Waktu dan Biaya Pada Proyek Konstruksi Jalan Dengan Earned Value Method (Studi Kasus : Proyek Pembangunan Jalur Jalan Lintas Selatan Paket Lot.1 Tambakreja - Bantarsari)

Raihan Adila Hidayat (2021) Kinerja Waktu dan Biaya Pada Proyek Konstruksi Jalan Dengan Earned Value Method (Studi Kasus : Proyek Pembangunan Jalur Jalan Lintas Selatan Paket Lot.1 Tambakreja - Bantarsari). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (1MB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf
Restricted to Registered users only

Download (445kB)
[thumbnail of Abstrak] Text (Abstrak)
Abstrak.pdf
Restricted to Registered users only

Download (432kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (874kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (3MB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (640kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (6MB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (403kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (920kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only

Download (891kB)
[thumbnail of Naskah Publikasi] Text (Naskah Publikasi)
Naskah Publikasi.pdf
Restricted to Registered users only

Download (453kB)
[thumbnail of Full Text] Text (Full Text)
Full Text.pdf
Restricted to Repository staff only

Download (15MB)

Abstract

The construction projects have a high level of complexity. Sometimes there are projects that are delayed or suffer losses. Earned Value Method combines in terms of cost, schedule, and work progress. This concept analyzes the work that has been completed at a time and assesses it based on the total budget that has been provided for each of these jobs. This method can calculate whether the progress of project work implementation is proportional to the use of the budgeted portion. This method will be implemented in the construction project of the Southern Cross Road Package Lot.1 Tambakreja – Bantarsari. In the project performance section, it is analyzed based on the cost performance index and schedule performance index. As for the calculation, it is based on BCWS, BCWP, and ACWP. The results of the CPI calculation for the 50th week until 54th week shows = 1 value, which means that it shows normal cost performance in this period and for an SPI it value< 1, it means that the project shows poor performance and is behind the planned target. Meanwhile, the estimated total cost to complete this project is Rp. 130.121.712.702 which means the project has suffered losses, and the project completion time has increased from 615 days to 1069 days, which means the project will be delayed.

Item Type: Thesis (S1)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 13 Dec 2021 07:23
Last Modified: 13 Dec 2021 07:23
URI: https://etd.umy.ac.id/id/eprint/6075

Actions (login required)

View Item
View Item