PENILAIAN RISIKO K3 TERHADAP PROYEK PEMBANGUNAN GEDUNG STUDENT DORMITORY

Nanda Nandhianta Putro (2021) PENILAIAN RISIKO K3 TERHADAP PROYEK PEMBANGUNAN GEDUNG STUDENT DORMITORY. S2 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (268kB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf
Restricted to Registered users only

Download (153kB)
[thumbnail of Abstrak] Text (Abstrak)
Abstrak.pdf
Restricted to Registered users only

Download (167kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (97kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (246kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (238kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (517kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (166kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (166kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only

Download (121kB)
[thumbnail of Naskah Publikasi] Text (Naskah Publikasi)
Naskah Publikasi.pdf
Restricted to Registered users only

Download (344kB)
[thumbnail of Full Text] Text (Full Text)
Full Text.pdf
Restricted to Repository staff only

Download (927kB)

Abstract

Building construction project work has a large risk impact. Therefore, the use of personal protective equipment is very necessary to reduce the risk of work accidents. In the contruction of the Student Dormitory building project, there are still many works who do not understand the importance of personal protective equipment. This study aims to review and analyze the impact or consequences of the risk of work accidents on the construction of the student dormitory building project University of Muhammadiyah Yogyakarta. Method in his study is a qualitative method. The overall result of the risk of work accidents obtained for the lowest scale is preparatory work, with a scale of 7.91 and the highest is foundation work with a scale of 12,52. The level of risk of work in the student Dormitory building construction project has a “Medium Risk” level. The k3 team must be more strict with workers who do not follow the rules that have been determined.

Item Type: Thesis (S2)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 14 Dec 2021 01:55
Last Modified: 14 Dec 2021 01:55
URI: https://etd.umy.ac.id/id/eprint/6118

Actions (login required)

View Item
View Item