ERNI KUSHANDAYANI (2005) ANALISIS OPTIMASI PENJADWALAN PENAMBAHAN TENAGA KERJA DAN JAM KERJA DENGAN METODE "LEAST COST ANALYSIS" (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG SEKOLAH DASAR NEGERI 005 LOKTUAN, BONTANG, KALIMANTAN TIMUR). S1 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (264kB) |
![]() |
Text (Bab I)
Bab I.pdf Download (131kB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (426kB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (402kB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (105kB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (882kB) |
Dosen Pembimbing: | Ir. H. Mandiyo Priyo, MT. and Dr. Muhammad Heri Zulfiar, S.T., M.T. | UNSPECIFIED, NIDN0515026701 |
---|---|
Item Type: | Thesis (S1) |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 28 Jul 2022 02:11 |
Last Modified: | 28 Jul 2022 02:11 |
URI: | https://etd.umy.ac.id/id/eprint/8736 |
Actions (login required)
![]() |
View Item |