ANALISIS OPTIMASI PENJADWALAN PENAMBAHAN TENAGA KERJA DAN JAM KERJA DENGAN METODE "LEAST COST ANALYSIS" (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG SEKOLAH DASAR NEGERI 005 LOKTUAN, BONTANG, KALIMANTAN TIMUR)

ERNI KUSHANDAYANI (2005) ANALISIS OPTIMASI PENJADWALAN PENAMBAHAN TENAGA KERJA DAN JAM KERJA DENGAN METODE "LEAST COST ANALYSIS" (STUDI KASUS PROYEK PEMBANGUNAN GEDUNG SEKOLAH DASAR NEGERI 005 LOKTUAN, BONTANG, KALIMANTAN TIMUR). S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (264kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (131kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (426kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (402kB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (105kB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (882kB)
Item Type: Thesis (S1)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 28 Jul 2022 02:11
Last Modified: 28 Jul 2022 02:11
URI: https://etd.umy.ac.id/id/eprint/8736

Actions (login required)

View Item
View Item