Items where Author is "ARIO MAULANA"

Group by: Item Type | No Grouping
Number of items: 1.

ARIO MAULANA (2016) OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (STUDI KASUS : PEKERJAAN PEMBANGUNAN TERMINAL PENUMPANG MODERN– SURABAYA). S1 thesis, Universitas Muhammadiyah Yogyakarta.

This list was generated on Sat Dec 21 21:49:28 2024 WIB.