[Atom feed] Atom [RSS feed] RSS 1.0 [RSS2 feed] RSS 2.0
Group by: Item Type | No Grouping
Jump to: Thesis
Number of items: 1.

Thesis

ARIO MAULANA (2016) OPTIMASI BIAYA DAN WAKTU PROYEK KONSTRUKSI DENGAN PENAMBAHAN JAM KERJA (LEMBUR) DIBANDINGKAN DENGAN PENAMBAHAN TENAGA KERJA MENGGUNAKAN METODE TIME COST TRADE OFF (STUDI KASUS : PEKERJAAN PEMBANGUNAN TERMINAL PENUMPANG MODERN– SURABAYA). S1 thesis, Universitas Muhammadiyah Yogyakarta.

This list was generated on Fri May 9 09:39:41 2025 WIB.