Riko Aryo Pangestu (2020) Analis risiko penyebab keterlambatan pembangunan gedung lantai 3 Condotel Aveon Yogyakarta. S1 thesis, Universitas Muhammadiyah Yogyakarta.
![]() |
Text (Halaman Judul)
Halaman Judul.pdf Download (3MB) |
![]() |
Text (Lembar Pengesahan)
Lembar Pengesahan.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (Abstrak)
Abstrak.pdf Restricted to Registered users only Download (521kB) |
![]() |
Text (Bab I)
Bab I.pdf Download (401kB) |
![]() |
Text (Bab II)
Bab II.pdf Restricted to Registered users only Download (488kB) |
![]() |
Text (Bab III)
Bab III.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (Bab IV)
Bab IV.pdf Restricted to Registered users only Download (6MB) |
![]() |
Text (Bab V)
Bab V.pdf Restricted to Registered users only Download (322kB) |
![]() |
Text (Daftar Pustaka)
Daftar Pustaka.pdf Restricted to Registered users only Download (272kB) |
![]() |
Text (Lampiran)
Lampiran.pdf Restricted to Registered users only Download (8MB) |
![]() |
Text (Naskah Publikasi)
Naskah Publikasi.pdf Restricted to Registered users only Download (1MB) |
![]() |
Text (Full Text)
Full Text.pdf Restricted to Repository staff only Download (13MB) |
Abstract
Delay in project time is an event that often occurs in construction project work.
Delays in projects can result in reduced profits targeted by the contractor. Time
delays can also be caused by poor project management as well as mistakes in
human resources. Therefore it is necessary to do research on the risk analysis of
delays in a project. The purpose of this study is to analyze the factors that cause
time delays in the construction project of the condotel aveon Yogyakarta building
with the AS / NZS 4360 management system standard. From the research results, it
was found that the factors that cause delays in the Condotel Aveon Yogyakarta
Condotel Building project include: labor, material, place characteristics,
managerial, and other factors with an average risk value for floor work of (8.15). )
which is the medium category, and the foundation structure work with the average
risk value (7.16) which is the medium category.
Dosen Pembimbing: | Dr. M. Heri Zulfiar, S.T., M.T. | NIDN0515026701 |
---|---|
Item Type: | Thesis (S1) |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | Unnamed user with email robi@umy.ac.id |
Date Deposited: | 12 Oct 2021 03:37 |
Last Modified: | 03 Nov 2021 02:50 |
URI: | https://etd.umy.ac.id/id/eprint/2098 |
Actions (login required)
![]() |
View Item |