Analis risiko penyebab keterlambatan pembangunan gedung lantai 3 Condotel Aveon Yogyakarta

Riko Aryo Pangestu (2020) Analis risiko penyebab keterlambatan pembangunan gedung lantai 3 Condotel Aveon Yogyakarta. S1 thesis, Universitas Muhammadiyah Yogyakarta.

[thumbnail of Halaman Judul] Text (Halaman Judul)
Halaman Judul.pdf

Download (3MB)
[thumbnail of Lembar Pengesahan] Text (Lembar Pengesahan)
Lembar Pengesahan.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of Abstrak] Text (Abstrak)
Abstrak.pdf
Restricted to Registered users only

Download (521kB)
[thumbnail of Bab I] Text (Bab I)
Bab I.pdf

Download (401kB)
[thumbnail of Bab II] Text (Bab II)
Bab II.pdf
Restricted to Registered users only

Download (488kB)
[thumbnail of Bab III] Text (Bab III)
Bab III.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of Bab IV] Text (Bab IV)
Bab IV.pdf
Restricted to Registered users only

Download (6MB)
[thumbnail of Bab V] Text (Bab V)
Bab V.pdf
Restricted to Registered users only

Download (322kB)
[thumbnail of Daftar Pustaka] Text (Daftar Pustaka)
Daftar Pustaka.pdf
Restricted to Registered users only

Download (272kB)
[thumbnail of Lampiran] Text (Lampiran)
Lampiran.pdf
Restricted to Registered users only

Download (8MB)
[thumbnail of Naskah Publikasi] Text (Naskah Publikasi)
Naskah Publikasi.pdf
Restricted to Registered users only

Download (1MB)
[thumbnail of Full Text] Text (Full Text)
Full Text.pdf
Restricted to Repository staff only

Download (13MB)

Abstract

Delay in project time is an event that often occurs in construction project work.
Delays in projects can result in reduced profits targeted by the contractor. Time
delays can also be caused by poor project management as well as mistakes in
human resources. Therefore it is necessary to do research on the risk analysis of
delays in a project. The purpose of this study is to analyze the factors that cause
time delays in the construction project of the condotel aveon Yogyakarta building
with the AS / NZS 4360 management system standard. From the research results, it
was found that the factors that cause delays in the Condotel Aveon Yogyakarta
Condotel Building project include: labor, material, place characteristics,
managerial, and other factors with an average risk value for floor work of (8.15). )
which is the medium category, and the foundation structure work with the average
risk value (7.16) which is the medium category.

Item Type: Thesis (S1)
Divisions: Fakultas Teknik > Teknik Sipil S1
Depositing User: Unnamed user with email robi@umy.ac.id
Date Deposited: 12 Oct 2021 03:37
Last Modified: 03 Nov 2021 02:50
URI: https://etd.umy.ac.id/id/eprint/2098

Actions (login required)

View Item
View Item